Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2020, 09:22 AM
  • H 0901_H 0900_11162020_015219.mp4

Date
11/16/2020
W/O
855027
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00192
PipeID
P16436
Time
1:22 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8197
Sewer Name
JOINT OUTFALL H - UNIT 8J
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_855027_TV22153_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Square
Height
15 in.
Width
15 in.
Upstream MH
H 0900
Downstream MH
H 0901
Dir. of Survey
Upstream
Length Surveyed
135.6 ft.
Total Length
135.6 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
133
O&M Index
2
O&M Quick
412D
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
189
Pipe schematic from manhole H 0900 to H 0901
MH: H 0900MH: H 0901upstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Ends - H 09011.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish64.9 ft. MWL - Water Level, 40 %of cross sectional area64.9 ft. MWM - Water Mark, 60 %of cross sectional area100.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES133.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start133.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start133.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start135.6 ft. MGO - General Observation - ROACHES @ MH135.6 ft. MGO - General Observation - CONN @ MH 8 OCLOCK/ACTIVE135.6 ft. MWM - Water Mark, 30 %of cross sectional area135.6 ft. MWL - Water Level, 25 %of cross sectional area135.6 ft. AMH - Downstream Manhole, Survey Begins - H 0900

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    8.3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • General Observation - ROACHES @ MH

    135.6 ft. - General Observation - ROACHES @ MH

Observations (19)

DistanceCodeObservation
8.3CM
0MGOROACHES @ MH
35.2TFA
0MGOCONN @ MH 8 OCLOCK/ACTIVE
134SAP
31.1TFC
135.6MGOROACHES @ MH
0MWM
0MWL
134DAGS
70.7MWL
135.6AMHH 0901
34.2TBA
2DAGS
70.7MWM
0AMHH 0900
2SAP
2SSS
133SSS

Properties (7)

additional_info
630069111620001
custom_field_three
PROJECTING AGGREGATE/CRACKS
custom_field_two
3
customer
1
datetime
2020-11-16T01:22:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false