Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 21, 2020, 06:12 AM
  • B 0689_B 0688_10202020_232344.mp4

Date
10/20/2020
W/O
849990
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09359
Time
11:12 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8163
Sewer Name
JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
WO_849990_TV15057_SEP2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
36 in.
Upstream MH
B 0689
Downstream MH
B 0688
Dir. of Survey
Downstream
Length Surveyed
207.9 ft.
Total Length
207.9 ft.
Structural Index
3
Structural Quick
3G2F
Structural Rating
197
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
279
Pipe schematic from manhole B 0689 to B 0688
MH: B 0689MH: B 0688downstream0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. AMH - Upstream Manhole, Survey Begins - B 06890 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start20.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start81.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"206.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish206.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish206.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish207.9 ft. AMH - Downstream Manhole, Survey Ends - B 0688207.9 ft. MGO - General Observation - COCKROACHES IN MH

Observation photos (5)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    20.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    207.9 ft. - General Observation - COCKROACHES IN MH

Observations (14)

DistanceCodeObservation
0MGOCOCKROACHES IN MH
206.9SSS
2DAGS
0AMHB 0689
206.9SAP
81.5TFA
0MWM
20.7SSS
206.9DAGS
0MGOCONNECTION AT MH, 9 O'CLOCK
207.9AMHB 0688
0MWL
2SAP
207.9MGOCOCKROACHES IN MH

Properties (7)

additional_info
6301020200138P1
custom_field_three
visible spalling/light grease/aggregate
custom_field_two
2
customer
1
datetime
2020-10-20T23:12:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false