Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 05:35 AM
  • F 0072A_F 0072 _11162020_214136.mp4

Date
11/16/2020
W/O
855024
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00035
PipeID
P10160
Time
9:35 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8212
Sewer Name
JOINT OUTFALL F - UNIT 3A
City
CERRITOS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_855024_TV02199_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
27 in.
Upstream MH
F 0072A
Downstream MH
F 0072
Dir. of Survey
Downstream
Length Surveyed
98 ft.
Total Length
98 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
90
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
94
Pipe schematic from manhole F 0072A to F 0072
MH: F 0072AMH: F 0072downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - F 0072A0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. MGO - General Observation - 40% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start97.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish97.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish97.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE98 ft. AMH - Downstream Manhole, Survey Ends - F 0072

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWM
97.8SAP
97.4SSS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMHF 0072A
98AMHF 0072
0MWL
97.8MGOCONN @ MH 9 O'CLOCK/ACTIVE
2MGO40% MAG COAT
6SAP
2SSS

Properties (7)

additional_info
630075111620201
custom_field_three
AGGREGATE PROJECTING/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-11-16T21:35:38-08:00
documentation
PROPIPE
is_lateral_inspection
false