Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 05:41 AM
  • F 0072_F 0071B _11162020_220935.mp4

Date
11/16/2020
W/O
855024
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00035
PipeID
P10159
Time
9:41 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8212
Sewer Name
JOINT OUTFALL F - UNIT 3A
City
CERRITOS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_855024_TV02199_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
27 in.
Upstream MH
F 0072
Downstream MH
F 0071B
Dir. of Survey
Downstream
Length Surveyed
286.9 ft.
Total Length
286.9 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
282
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
282
Pipe schematic from manhole F 0072 to F 0071B
MH: F 0072MH: F 0071Bdownstream0 ft. AMH - Upstream Manhole, Survey Begins - F 00720 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN0.1 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. MGO - General Observation - 45% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start285.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish286.9 ft. AMH - Downstream Manhole, Survey Ends - F 0071B ZOOMED IN

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2MGO45% MAG COAT
4.2SAP
286.9AMHF 0071B ZOOMED IN
0AMHF 0072
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SSS
0MWL
285.3SSS
285.3SAP
0.1MWM
0MGOCONN @ MH 3 O'CLOCK/OPEN

Properties (7)

additional_info
630075111620201
custom_field_three
AGGREGATE PROJECTING/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2020-11-16T21:41:59-08:00
documentation
PROPIPE
is_lateral_inspection
false