Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 08:18 AM
  • F 0071_F 0070 _11172020_011130.mp4

Date
11/17/2020
W/O
855024
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00035
PipeID
P10156
Time
12:18 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8212
Sewer Name
JOINT OUTFALL F - UNIT 3A
City
CERRITOS
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_855024_TV02199_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
18 in.
Upstream MH
F 0071
Downstream MH
F 0070
Dir. of Survey
Downstream
Length Surveyed
568.3 ft.
Total Length
568.4 ft.
Structural Index
3
Structural Quick
3V2V
Structural Rating
565
O&M Index
2
O&M Quick
2V00
O&M Rating
226
Overall Index
2
Overall Quick
Overall Rating
791
Pipe schematic from manhole F 0071 to F 0070
MH: F 0071MH: F 0070downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 00712 ft. MGO - General Observation - 35% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start164.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"351.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"566 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish568.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish568.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish568.4 ft. AMH - Downstream Manhole, Survey Ends - F 0070 ZOOMED IN

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2.1SAP
2.1SSS
164.7TFA
566DAGS
0MWM
568.4SSS
568.4SAP
351.4TFA
2MGO35% MAG COAT
0MWL
2DAGS
0AMHF 0071
568.4AMHF 0070 ZOOMED IN

Properties (7)

additional_info
630075111620201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2020-11-17T00:18:03-08:00
documentation
PROPIPE
is_lateral_inspection
false