Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2020, 09:59 AM
  • 20 0334_20 0333_11022020_021433.mp4

Date
11/02/2020
W/O
855322
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00755
PipeID
P19283
Time
1:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8178
Sewer Name
45TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_855322_TV20061_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0334
Downstream MH
20 0333
Dir. of Survey
Downstream
Length Surveyed
435.1 ft.
Total Length
435.1 ft.
Structural Index
3
Structural Quick
3P00
Structural Rating
258
O&M Index
2
O&M Quick
412P
O&M Rating
176
Overall Index
3
Overall Quick
Overall Rating
434
Pipe schematic from manhole 20 0334 to 20 0333
MH: 20 0334MH: 20 0333downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 8 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 03342 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"74.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"99 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"147 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"246.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"322.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"346.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"370.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"394.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"418.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"433.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish433.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish435.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0333

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
51TFC
0MWL
27.1TFC
433.4DAGS
270.6TFC
246.8TFC
2DAGS
122.9TFC
418.4TFC
298.8TFC
322.6TFC
170.8TFC
147TFC
433.4SAP
0MGOCONNECTION AT MH, 8 O'CLOCK
222.4TFC
198.6TFC
435.1AMH20 0333
74.8TFC
0MWM
346.8TFC
394.5TFC
2.5SAP
370.5TFC
99TFC
0AMH20 0334

Properties (7)

additional_info
6301102200138A1
custom_field_three
light grease/projecting aggregate
custom_field_two
3
customer
1
datetime
2020-11-02T01:59:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false