Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 28, 2020, 09:37 AM
  • 29 0467_29 0466_10282020_015023.mp4

Date
10/28/2020
W/O
855105
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01090
PipeID
P24511
Time
2:37 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7393
Sewer Name
ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_855105_TV29104_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0467
Downstream MH
29 0466
Dir. of Survey
Downstream
Length Surveyed
250.6 ft.
Total Length
250.6 ft.
Structural Index
3
Structural Quick
523I
Structural Rating
258
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
260
Pipe schematic from manhole 29 0467 to 29 0466
MH: 29 0467MH: 29 0466downstream0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 04670 ft. MWL - Water Level, 5 %of cross sectional area1 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN3.3 ft. FS - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES4 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN13.4 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN69.6 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4" - OPEN109.3 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 6" - OPEN248 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish248 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250.6 ft. AMH - Downstream Manhole, Survey Ends - 29 0466

Observation photos (5)

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

    3.3 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

  • Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

    3.3 ft. - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

    4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

    13.4 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4" - OPEN

    69.6 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4" - OPEN

Observations (16)

DistanceCodeObservation
2CM
1B
69.6TBOPEN
250.6AMH29 0466
0MWM
4B
0AMH29 0467
0MWL
4TBOPEN
3.3TBOPEN
2SSS
13.4TBOPEN
248CM
3.3FS
248SSS
109.3TBIOPEN

Properties (6)

custom_field_three
FRACTURE
custom_field_two
3
customer
1
datetime
2020-10-28T02:37:17-07:00
documentation
PROPIPE
is_lateral_inspection
false