Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 11:27 AM
  • C 0653_C 0652 _11202020_033823.mp4

Date
11/20/2020
W/O
855317
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00266
PipeID
P23919
Time
3:27 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8310
Sewer Name
JOINT OUTFALL C - UNIT 3F
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_855317_TV03162_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
C 0653
Downstream MH
C 0652
Dir. of Survey
Downstream
Length Surveyed
307.3 ft.
Total Length
307.3 ft.
Structural Index
2
Structural Quick
3I2K
Structural Rating
279
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
401
Pipe schematic from manhole C 0653 to C 0652
MH: C 0653MH: C 0652downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 06532 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.3 ft. CC - Crack Circumferential, from 01 to 05 o'clock, within 8 inches of joint: YES48.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES305 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish305 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish307.3 ft. AMH - Downstream Manhole, Survey Ends - c 0652307.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Circumferential, from 01 to 05 o'clock, within 8 inches of joint: YES

    36.3 ft. - Crack Circumferential, from 01 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    48.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
305SSS
0MWL
2DAGS
48.8CM
2CM
36.3CC
307.3AMHc 0652
0MWM
305DAGS
0AMHC 0653
2SSS
307.3CM

Properties (8)

additional_info
630075111920204
custom_field_three
SPALLING/MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-11-20T03:27:28-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
37482