Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 11:00 AM
  • 16 0359_16 0358 _11182020_031013.mp4

Date
11/18/2020
W/O
855315
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00665
PipeID
P13410
Time
3:00 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8217
Sewer Name
SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_855315_TV16060_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
14 in.
Width
14 in.
Upstream MH
16 0359
Downstream MH
16 0358
Dir. of Survey
Downstream
Length Surveyed
195.1 ft.
Total Length
195.1 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
111
O&M Index
2
O&M Quick
2G00
O&M Rating
76
Overall Index
2
Overall Quick
Overall Rating
187
Pipe schematic from manhole 16 0359 to 16 0358
MH: 16 0359MH: 16 0358downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 03590 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9.8 ft. CM - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES12.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start80.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"96.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"192.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish192.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195.1 ft. AMH - Downstream Manhole, Survey Ends - 16 0358

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

    9.8 ft. - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    80.3 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    96.3 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (11)

DistanceCodeObservation
192.2DAGS
9.8CM
96.3TB
192.2CM
2DAGS
0AMH16 0359
0MWM
80.3TB
195.1AMH16 0358
0MWL
12.1CM

Properties (6)

custom_field_three
MULTIPLE CRACKS, GREASE
custom_field_two
3
customer
1
datetime
2020-11-18T03:00:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false