Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 10:26 AM
  • 16 0356_16 0355 _11182020_024241.mp4

Date
11/18/2020
W/O
855315
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00665
PipeID
P13407
Time
2:26 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8217
Sewer Name
SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_855315_TV16060_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
16 0356
Downstream MH
16 0355
Dir. of Survey
Downstream
Length Surveyed
277.7 ft.
Total Length
277.7 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
162
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
3
Overall Quick
Overall Rating
272
Pipe schematic from manhole 16 0356 to 16 0355
MH: 16 0356MH: 16 0355downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 03560 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"46.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"143.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8" - LINER INTRUDING IN MAINLINE146.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"240.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"243.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"276.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish277.7 ft. AMH - Downstream Manhole, Survey Ends - 16 0355

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    46.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8" - LINER INTRUDING IN MAINLINE

    143.7 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8" - LINER INTRUDING IN MAINLINE

Observations (15)

DistanceCodeObservation
143.7TFLINER INTRUDING IN MAINLINE
2DAGS
7.6CM
243.6TFA
46.9TB
276.4DAGS
0MWL
146.2TFC
276.3CM
0MWM
240.9TFC
0AMH16 0356
44.6TF
277.7AMH16 0355
0MGOCONNECTION AT MH, 3 O'CLOCK

Properties (6)

custom_field_three
MULTIPLE CRACKS, GREASE
custom_field_two
3
customer
1
datetime
2020-11-18T02:26:09-08:00
documentation
PRO PIPE
is_lateral_inspection