Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 10:08 AM
  • 16 0096_16 0095_11122020_022135.mp4

Date
11/12/2020
W/O
855013
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00641
PipeID
P13134
Time
2:08 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8204
Sewer Name
ALLEN AVENUE TRUNK, SECTION 5
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_855013_TV16009_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
16 0096
Downstream MH
16 0095
Dir. of Survey
Downstream
Length Surveyed
352 ft.
Total Length
352 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
348
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
348
Pipe schematic from manhole 16 0096 to 16 0095
MH: 16 0096MH: 16 0095downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 00962 ft. MGO - General Observation - MAG COAT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start351 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish352 ft. AMH - Downstream Manhole, Survey Ends - 16 0095

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWM
0MWL
0AMH16 0096
352AMH16 0095
351SSS
5SSS
2MGOMAG COAT
2SAV
351SAV

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
2
customer
1
datetime
2020-11-12T02:08:08-08:00
documentation
PRO PIPE
is_lateral_inspection
false