Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 09:10 AM
  • 15 0614_15 0613A_11122020_013402.mp4

Date
11/12/2020
W/O
855316
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P24099
Time
1:10 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8190
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_855316_TV15205_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0614
Downstream MH
15 0613A
Dir. of Survey
Downstream
Length Surveyed
236.2 ft.
Total Length
236.2 ft.
Structural Index
3
Structural Quick
4134
Structural Rating
18
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 15 0614 to 15 0613A
MH: 15 0614MH: 15 0613Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06140 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES8.7 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start17.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"24.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish31.6 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES36.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish54.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start78.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.4 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"151.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"226.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"233.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish233.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish233.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish236.2 ft. MGO - General Observation - CONNECTION AT MH 3 AND 9 OCLOCK236.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0613A

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    4.5 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    8.7 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

    31.6 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    36.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    54.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
236.2MGOCONNECTION AT MH 3 AND 9 OCLOCK
233.3DAGS
54.8SAV
226.6TF
31.6FS
0MWL
36.6FM
0AMH15 0614
17.2TFC
78.7TF
151.1TF
233.3FM
102.4TBA
51.2TFA
4.5CL
2DAGS
54.8SAP
233.3SAP
229.3TF
24.9FL
2SAV
0MWM
236.2AMH15 0613A
8.7FL
129.4TFA

Properties (7)

additional_info
630069111220001
custom_field_three
PROJECTING AGGREGATE/MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-11-12T01:10:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false