Wastewater/Activity/PacpInspection/1.0Nov 30, 2020, 10:38 AM
  • 22 0752_22 0751_11302020_024329.mp4

Date
11/30/2020
W/O
0860113
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00821
PipeID
P17109
Time
2:38 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1640
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Capital Improvement Program Assesment
Project
20201130MDM_PUDDINGSTONE_TRUNK_SECTS_1_2
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0752
Downstream MH
22 0751
Dir. of Survey
Downstream
Length Surveyed
100 ft.
Total Length
100 ft.
Structural Index
4
Structural Quick
4321
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
14
Pipe schematic from manhole 22 0752 to 22 0751
MH: 22 0752MH: 22 0751downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:40AM2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MG COAT 98% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE5.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active15.9 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG49 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped64 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG99.9 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG99.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE99.9 ft. MGO - General Observation - MAG COAT 98% FINISH99.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped100 ft. MSA - Survey Abandoned - OUT OF CABLE WILL COMPLETE REVERSE INSPECTION

Observation photos (5)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MG COAT 98% START

    2 ft. - General Observation - MG COAT 98% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    15.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    64 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (15)

DistanceCodeObservation
2SAMSEVERE AGG
2MGOMG COAT 98% START
2SSSBLISTERING PEELING CONCRETE
15.9SAMSEVERE AGG
99.9SAMSEVERE AGG
49TFCCapped
99.9SSSBLISTERING PEELING CONCRETE
0MWL
5.5TBActive
100MSAOUT OF CABLE WILL COMPLETE REVERSE INSPECTION
0MWM
99.9MGOMAG COAT 98% FINISH
0AMH2:40AM
99.9TFCCapped
64SAMSEVERE AGG

Properties (4)

customer
LACSD
datetime
2020-11-30T02:38:51-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false