Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 24, 2020, 08:34 PM
  • 18 1056_18 1055_11242020_123801.mp4

  • 18 1056_18 1055_11242020_130041.mp4

Date
11/24/2020
W/O
0864886
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00680
PipeID
P14911
Time
12:34 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1639
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 3
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20201124SHO_LA_HABRA_HEIGHTS_TRUNK_SECTION_3
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
18 1056
Downstream MH
18 1055
Dir. of Survey
Downstream
Length Surveyed
345.5 ft.
Total Length
345.5 ft.
Structural Index
2
Structural Quick
3222
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 18 1056 to 18 1055
MH: 18 1056MH: 18 1055downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 10560 ft. MWM - Water Mark, 15 %of cross sectional area5 ft. SSS - Surface Spalling, from 09 to 10 o'clock, within 8 inches of joint: YES27.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"32.6 ft. CC - Crack Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES78.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"127.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"137.1 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES167.2 ft. CC - Crack Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES177.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"218.7 ft. CM - Crack Multiple, from 08 to 09 o'clock, within 8 inches of joint: YES225.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"229.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start276.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"321.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"342.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish345.5 ft. AMH - Downstream Manhole, Survey Ends - MH 1055

Observations (18)

DistanceCodeObservation
225.7TFC
342.3CM
137.1CL
345.5AMHMH 1055
0MWL
0AMHMH 1056
167.2CC
5SSS
177.5TFC
0MWM
78.7TFC
32.6CC
27.8TFA
276.8TFC
229.8CM
218.7CM
127.3TFC
321.4TFC

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-11-24T12:34:47-08:00
documentation
OBREGON, IGNACIO, RAMIREZ, BRAR
is_lateral_inspection
false