Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2020, 08:38 AM
  • 22 0875_22 0874_10142020_021406.mp4

Date
10/14/2020
W/O
849554
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00798
PipeID
P17244
Time
1:38 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8160
Sewer Name
CONEY TRUNK, SECTION 1
City
AZUSA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_849554_TV22103_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0875
Downstream MH
22 0874
Dir. of Survey
Downstream
Length Surveyed
339 ft.
Total Length
339 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
134
Pipe schematic from manhole 22 0875 to 22 0874
MH: 22 0875MH: 22 0874downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 08750 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start28 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"67.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"141.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"175.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"226.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"257.5 ft. MGO - General Observation - TAP FACTORY MADE, AT 10 O'CLOCK, - , WITHIN 8 INCHES OF JOINT: NO. STATUS, ETC... UNKNOWN - "PASSED-BY".306.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"323 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"336 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish339 ft. AMH - Downstream Manhole, Survey Ends - 22 0874

Observation photos (2)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH22 0875
0MWM
67.6TFC
101.1TFC
226.9TFC
257.5MGOTAP FACTORY MADE, AT 10 O'CLOCK, - , WITHIN 8 INCHES OF JOINT: NO. STATUS, ETC... UNKNOWN - "PASSED-BY".
323TFC
336DAGS
175.6TFC
28TFC
0MWL
339AMH22 0874
2MGOMAG COATING THROUGHOUT
141.9TFC
2DAGS
306.7TFC

Properties (7)

additional_info
6301013200138P2
custom_field_three
RFIR/LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-10-14T01:38:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false