Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 05:52 PM
  • 1_1_1_20112020_100108.mp4

Date
11/20/2020
W/O
0860089
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00111
PipeID
P09464
Time
9:52 AM
Certificate
U-415-06024039
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0360
Sewer Name
JOINT OUTFALL B - UNIT 8H
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
01
Purpose
Routine Assessment
Project
20201120DF_JOINT_OUTFALL_B_UNIT_8H
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
36 in.
Upstream MH
B 0734
Downstream MH
B 0733D
Dir. of Survey
Downstream
Length Surveyed
127.6 ft.
Total Length
127.6 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
125
O&M Index
2
O&M Quick
2D00
O&M Rating
52
Overall Index
2
Overall Quick
Overall Rating
177
Pipe schematic from manhole B 0734 to B 0733D
MH: B 0734MH: B 0733Ddownstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:56 AM1 ft. MGO - General Observation - ROACHES @ MH1 ft. MWL - Water Level, 10 %of cross sectional area1 ft. MWM - Water Mark, 15 %of cross sectional area1.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 0 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"20.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN20.7 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE76.2 ft. RFB - Roots Fine Barrell, from 07 to 09 o'clock116.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"125.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish125.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish125.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish127.6 ft. MGO - General Observation - CONN @ 3 O'CLOCK/ACTIVE127.6 ft. AMH - Downstream Manhole, Survey Ends - 10:44 AM127.6 ft. MGO - General Observation - ROACHES @ MH

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Barrell, from 07 to 09 o'clock

    76.2 ft. - Roots Fine Barrell, from 07 to 09 o'clock

Observations (18)

DistanceCodeObservation
20.7MGOCONN @ MH 9 O'CLOCK/ACTIVE
1MGOROACHES @ MH
0AMH9:56 AM
127.6MGOCONN @ 3 O'CLOCK/ACTIVE
125.7DAGS
2DAGS
127.6AMH10:44 AM
7TFA
127.6MGOROACHES @ MH
1MWL
2SSS
20.6TFOPEN
116.9TFA
125.7SSS
125.7CM
1.9CM
1MWM
76.2RFB

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2020-11-20T09:52:46-08:00
documentation
FRANKLIN, RAMIREZ
is_lateral_inspection
false