Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 21, 2020, 07:53 AM
  • 02 1655_02 1654_11202020_000006.mp4

Date
11/20/2020
W/O
0860090
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00289
PipeID
P18810
Time
11:53 PM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1634
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
LOS ANGELES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20201120MDM_MONTERY_PARK_EXTENSION_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1654
Downstream MH
02 1655
Dir. of Survey
Upstream
Length Surveyed
163.5 ft.
Total Length
163.5 ft.
Structural Index
3
Structural Quick
4123
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 02 1654 to 02 1655
MH: 02 1654MH: 02 1655upstream0 ft. AMH - Downstream Manhole, Survey Ends - 12:30AM0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED0 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG69.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open85.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED142.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRET SEVERE AGG ATTACHED161.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED161.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG163.5 ft. AMH - Downstream Manhole, Survey Begins - 12:00AM163.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active163.5 ft. MWL - Water Level, 20 %of cross sectional area163.5 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRET SEVERE AGG ATTACHED

    20.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRET SEVERE AGG ATTACHED

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

    78.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

Observations (12)

DistanceCodeObservation
163.5AMH12:30AM
0AMH12:00AM
0MGOConn. @ Mh, 9 O' Clock. Active
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
163.5SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MWL
163.5SAMSEVERE AGG
2SAMSEVERE AGG
93.9TFOpen
20.9SSSPEELING CONCRET SEVERE AGG ATTACHED
78.1SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MWM

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2020-11-20T23:53:23-08:00
documentation
MARTIN,OLIVER 111,RUVALCABA
is_lateral_inspection
false