3_1_1_22102020_131322.mp4
0 ft. - Upstream Manhole, Survey Begins - 1:09 PM
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Infiltration Runner, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 1:09 PM |
| 760 | TFA | — |
| 0.1 | MWL | — |
| 2 | DAGS | — |
| 2 | SSS | — |
| 2 | SAP | — |
| 1 | MWM | — |
| 789.3 | IR | — |
| 789.3 | DAGS | — |
| 789.3 | SRC | — |
| 2 | SRC | — |
| 789.3 | AMH | 2:07 PM |
| 789.3 | SAP | — |
| 789.3 | SSS | — |
| 2 | IR | — |