16 0511_16 0510_11122020_213429.mp4
14.1 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"
25 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 8"
63.7 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"
86.5 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 8"
112.6 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4", 8"
123.1 ft. - Material Change, Cast Iron
123.1 ft. - Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
123.2 ft. - Surface Corrosion Metal Pipe, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
218.3 ft. - Material Change, Vitrified clay pipe
| Distance | Code | Observation |
|---|---|---|
| 254.2 | AMH | 16 0510 |
| 2 | SSS | — |
| 112.6 | TBA | — |
| 123 | SSS | — |
| 63.7 | TBA | — |
| 123.1 | MMC | — |
| 218.2 | SRI | — |
| 218.3 | MMC | — |
| 218.2 | SCP | — |
| 0 | AMH | 16 0511 |
| 0 | MWM | — |
| 123.1 | SRI | — |
| 252 | DAGS | — |
| 25 | TBA | — |
| 123.2 | SCP | — |
| 86.5 | TBA | — |
| 0 | DAGS | — |
| 14.1 | TBA | — |
| 0 | MWL | — |