Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 11:46 AM
  • 15 0608_15 0607A_11122020_035320.mp4

Date
11/12/2020
W/O
854911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P26625
Time
3:46 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8191
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0608
Downstream MH
15 0607A
Dir. of Survey
Downstream
Length Surveyed
148.3 ft.
Total Length
148.3 ft.
Structural Index
2
Structural Quick
3E2E
Structural Rating
142
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
2
Overall Quick
Overall Rating
200
Pipe schematic from manhole 15 0608 to 15 0607A
MH: 15 0608MH: 15 0607Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 06080 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"99.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.9 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"146 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish148.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0607A148.3 ft. MGO - General Observation - CONN @ MH 3 OCLOCK/OPEN

Observation photos (3)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
148.3AMH15 0607A
148.3MGOCONN @ MH 3 OCLOCK/OPEN
105.8TFC
4.9SAP
2SSS
99.3TFA
0AMH15 0608
0MGOROACHES IN MH
146SSS
0MWL
0MWM
146.9SAP
2DAGS
146.9DAGS
124.9TBA
15.6TFA
51.7TFA

Properties (7)

additional_info
630069111220002
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-12T03:46:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false