Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 11:23 AM
  • 15 0609A_15 0609_11122020_033005.mp4

Date
11/12/2020
W/O
854911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P12543
Time
3:23 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8191
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_854911_TV15183_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0609A
Downstream MH
15 0609
Dir. of Survey
Downstream
Length Surveyed
75.6 ft.
Total Length
75.6 ft.
Structural Index
3
Structural Quick
3D2B
Structural Rating
103
O&M Index
2
O&M Quick
2B00
O&M Rating
28
Overall Index
2
Overall Quick
Overall Rating
131
Pipe schematic from manhole 15 0609A to 15 0609
MH: 15 0609AMH: 15 0609downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 0609A0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"40.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"73 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish74.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish74.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish74.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish75.6 ft. AMH - Downstream Manhole, Survey Ends - 15 060975.6 ft. MGO - General Observation - ROACHES IN MH

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    75.6 ft. - General Observation - ROACHES IN MH

Observations (15)

DistanceCodeObservation
2SAP
74.3CM
2DAGS
4.5TFA
74.3DAGS
74.3SAP
2CM
75.6AMH15 0609
0MWL
0AMH15 0609A
73SSS
40.5TFA
0MWM
75.6MGOROACHES IN MH
2SSS

Properties (7)

additional_info
630069111220002
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-12T03:23:39-08:00
documentation
PRO PIPE
is_lateral_inspection
false