Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 11:30 AM
  • 15 0609_15 0608A_11122020_033753.mp4

Date
11/12/2020
W/O
854911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P12542
Time
3:30 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8191
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_854911_TV15183_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0609
Downstream MH
15 0608A
Dir. of Survey
Downstream
Length Surveyed
143.4 ft.
Total Length
143.4 ft.
Structural Index
3
Structural Quick
3K2E
Structural Rating
230
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
3
Overall Quick
Overall Rating
288
Pipe schematic from manhole 15 0609 to 15 0608A
MH: 15 0609MH: 15 0608Adownstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06092 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"61.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.5 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 6" - OPEN115.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES139.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES141 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish141 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish141.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish141.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish143.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0608A143.4 ft. MGO - General Observation - CONN @ MH 3 OCLOCK/UNKNOWN

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    115.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    139.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
2DAGS
0MWL
115.3CM
141.6DAGS
0MGOROACHES IN MH
61.5TFA
143.4AMH15 0608A
2CM
143.4MGOCONN @ MH 3 OCLOCK/UNKNOWN
141SSS
17.1TFA
113.5TBIOPEN
2.3SAP
141CM
139.5CM
2SSS
0MWM
0AMH15 0609
141.6SAP
98.9TFA

Properties (7)

additional_info
630069111220002
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-12T03:30:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false