Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 11:38 AM
  • 15 0608A_15 0608_11122020_034543.mp4

Date
11/12/2020
W/O
854911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P12541
Time
3:38 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8191
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_854911_TV15183_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0608A
Downstream MH
15 0608
Dir. of Survey
Downstream
Length Surveyed
161.3 ft.
Total Length
161.3 ft.
Structural Index
3
Structural Quick
3K2E
Structural Rating
250
O&M Index
2
O&M Quick
2E11
O&M Rating
63
Overall Index
2
Overall Quick
Overall Rating
313
Pipe schematic from manhole 15 0608A to 15 0608
MH: 15 0608AMH: 15 0608downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 OCLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 15 0608A2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.8 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES18.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"37.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.4 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES100.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"159 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish159 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish159.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish159.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish161.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0608161.3 ft. MGO - General Observation - ROACHES IN MH

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    8.8 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES

    53.4 ft. - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES

  • General Observation - ROACHES IN MH

    161.3 ft. - General Observation - ROACHES IN MH

Observations (20)

DistanceCodeObservation
53.4RFJ
2CM
116.5TFA
161.3AMH15 0608
2DAGS
159SSS
159CM
2SSS
8.8CL
161.3MGOROACHES IN MH
0MWM
0MWL
37.4TFA
2.1SAP
18.5TFA
0MGOCONN @ MH 3 OCLOCK/ACTIVE
100.3TFA
159.1SAP
159.1DAGS
0AMH15 0608A

Properties (7)

additional_info
630069111220002
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-12T03:38:07-08:00
documentation
PRO PIPE
is_lateral_inspection
false