Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 12:01 PM
  • 15 0607_15 0606_11122020_040705.mp4

Date
11/12/2020
W/O
854911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P12539
Time
4:01 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8191
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_854911_TV15183_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0607
Downstream MH
15 0606
Dir. of Survey
Downstream
Length Surveyed
91.6 ft.
Total Length
91.6 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
85
O&M Index
2
O&M Quick
2C00
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
121
Pipe schematic from manhole 15 0607 to 15 0606
MH: 15 0607MH: 15 0606downstream0 ft. MGO - General Observation - CONN @ MH 9 OCLOCK/OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 15 06070 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"50.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"56 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"89 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish89.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish89.7 ft. MGO - General Observation - ROACHES IN MH89.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish91.6 ft. AMH - Downstream Manhole, Survey Ends - 15 060691.6 ft. MGO - General Observation - CONN @ MH 9 OCLOCK/ACTIVE

Observation photos (4)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    89.7 ft. - General Observation - ROACHES IN MH

Observations (17)

DistanceCodeObservation
56TFA
2DAGS
0MGOCONN @ MH 9 OCLOCK/OPEN
89.7DAGS
89.7MGOROACHES IN MH
4.9SAP
91.6AMH15 0606
0AMH15 0607
91.6MGOCONN @ MH 9 OCLOCK/ACTIVE
17.3TFC
89SSS
2SSS
89.7SAP
0MWL
0MWM
50.3TFA
0MGOROACHES IN MH

Properties (7)

additional_info
630069111220002
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-12T04:01:13-08:00
documentation
PRO PIPE
is_lateral_inspection
false