Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 12:23 PM
  • 15 0605_15 0604_11122020_044009.mp4

Date
11/12/2020
W/O
854911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P12537
Time
4:23 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8191
Sewer Name
DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_854911_TV15183_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0605
Downstream MH
15 0604
Dir. of Survey
Downstream
Length Surveyed
315.1 ft.
Total Length
315.1 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
434
Pipe schematic from manhole 15 0605 to 15 0604
MH: 15 0605MH: 15 0604downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 15 06050 ft. MGO - General Observation - CONN @ MH 9 OCLOCK/ACTIVE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES70.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"173.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.3 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"262 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"311.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish313 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish315.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0604315.1 ft. MGO - General Observation - ROACHES IN MH

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    67 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - ROACHES IN MH

    315.1 ft. - General Observation - ROACHES IN MH

Observations (23)

DistanceCodeObservation
0MWM
198.3TFA
250.3TBA
67CM
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SSS
0AMH15 0605
173.9TFA
315.1AMH15 0604
82.8TFC
70.7TFC
0MGOCONN @ MH 9 OCLOCK/ACTIVE
313SSS
267.8TBA
262TFA
311.4SAP
0MWL
315.1MGOROACHES IN MH
2DAGS
131.9TFA
311.4DAGS
0MGOROACHES IN MH
6.2SAP

Properties (7)

additional_info
630069111220002
custom_field_three
PROJECTING AGGREGATE/FRACTURES
custom_field_two
3
customer
1
datetime
2020-11-12T04:23:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false