Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 28, 2020, 08:57 AM
  • 14 0159_14 0158_10282020_021542.mp4

Date
10/28/2020
W/O
850059
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18195
Time
1:57 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8174
Sewer Name
WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_850059_TV14035_SEP2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0159
Downstream MH
14 0158
Dir. of Survey
Downstream
Length Surveyed
437 ft.
Total Length
437 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
435
O&M Index
2
O&M Quick
412P
O&M Rating
178
Overall Index
2
Overall Quick
Overall Rating
613
Pipe schematic from manhole 14 0159 to 14 0158
MH: 14 0159MH: 14 0158downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01592 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start18.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"21.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"69.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"120.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"168.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"216.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"319.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"321.7 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"367.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"370.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"415 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"418.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"434.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish434.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish434.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish437 ft. AMH - Downstream Manhole, Survey Ends - 14 0158

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
370.4TFC
434.9SSS
2SAP
267.8TFC
437AMH14 0158
0MWL
0MWM
18.5TFC
69.1TFC
418.4TFC
2DAGS
216.7TFC
270.7TFC
367.1TFC
415TFC
434.9DAGS
0AMH14 0159
321.7TFA
168.5TFC
2SSS
434.9SAP
120.6TFA
21.5TFA
117.8TFC
319.2TFC

Properties (7)

additional_info
6301027200138P1
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-10-28T01:57:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false