Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 23, 2020, 10:03 AM
  • 14 0178A_14 0178_09232020_030811.mp4

Date
09/23/2020
W/O
850059
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18217
Time
3:03 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8151
Sewer Name
WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_850059_TV14035_SEP2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0178A
Downstream MH
14 0178
Dir. of Survey
Downstream
Length Surveyed
10 ft.
Total Length
10 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4131
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 14 0178A to 14 0178
MH: 14 0178AMH: 14 0178downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0178A0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION IN MH, 9 O' CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES3.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish7.8 ft. MGO - General Observation - COCKROACHES AT MH7.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish7.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish10 ft. AMH - Downstream Manhole, Survey Ends - 14 0178

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES AT MH

    7.8 ft. - General Observation - COCKROACHES AT MH

Observations (13)

DistanceCodeObservation
3.3SSS
2DAGS
2DAGS
3.3SAP
7.8SSS
7.8MGOCOCKROACHES AT MH
0AMH14 0178A
0MWM
0MGOCONNECTION IN MH, 9 O' CLOCK
0MWL
7.8SAP
7.8DAGS
10AMH14 0178

Properties (7)

additional_info
SC411894
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-09-23T03:03:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false