- Date
- 10/14/2020
- W/O
- 850058
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00481
- PipeID
- P07516
- Time
- 1:54 AM
- Certificate
- U-508-7069
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K8119
- Sewer Name
- MANCHESTER AVENUE PUMP TRUNK
- City
- LOS ANGELES
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 11
- Purpose
- Routine Assessment
- Project
- WO_850058_TV05304_SEP2020
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 12 in.
- Width
- 30 in.
- Upstream MH
- 05 2405
- Downstream MH
- 05 2404
- Dir. of Survey
- Downstream
- Length Surveyed
- 240.9 ft.
- Total Length
- 240.9 ft.
- Structural Index
- 4
- Structural Quick
- 4100
- Structural Rating
- 4
- O&M Index
- 3
- O&M Quick
- 3I12
- O&M Rating
- 149
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 153
Pipe schematic from manhole 05 2405 to 05 2404 Observation photos (5)

2.1 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

2.1 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES

20.7 ft. - Roots Fine Joint, from 03 to 05 o'clock, within 8 inches of joint: YES

20.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

141.4 ft. - Roots Fine Connection, at 12 o'clock - APPROX. 15% OF LINE CROSS-SECTION