D 0066_05 0064_11162020_052933.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
7.1 ft. - General Photograph - CORRISION BEYOUND REBAR
7.1 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR MISSING -CORRISON BEYOUND REBAR
7.2 ft. - General Photograph - MISSING REBAR NUBS
9.4 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG &CIRCUM REBAR
14.3 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR MISSING
29.3 ft. - General Observation - ZOOM 15'
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 14.3 | SRC | LONG & CIRCUM REBAR MISSING |
| 29.3 | MGO | ZOOM 15' |
| 29.3 | SRC | — |
| 2 | SAM | SEVERE AGG |
| 0 | AMH | 5:35AM |
| 29.3 | SRC | LONG & CIRCUM REBAR MISSING |
| 14.3 | DSZ | SLUDGE |
| 7.1 | MGP | CORRISION BEYOUND REBAR |
| 29.3 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWL | — |
| 7.1 | SRC | CIRCUM REBAR MISSING -CORRISON BEYOUND REBAR |
| 29.3 | SAM | SEVERE AGG |
| 29.8 | AMH | 5:45AM |
| 9.4 | SRC | LONG &CIRCUM REBAR |
| 0 | MWM | — |
| 7.2 | MGP | MISSING REBAR NUBS |
| 2 | DSZ | SLUDGE |