D 0067_D 0066_11162020_033318.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2.7 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
2.7 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
6 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
9.1 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
17.7 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
17.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
36.8 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
115.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
130 ft. - Surface Reinforcement Visible, from 11 to 02 o'clock, within 8 inches of joint: NO - CIRCUM & LONG REBAR
141 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
156.2 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
163.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
188.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
220.6 ft. - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
266.9 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM & LONG REBAR
337.4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
452.9 ft. - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 203.8 | SRV | CIRCUM REBAR |
| 0 | AMH | 3:25AM |
| 475.4 | SSS | BLISTERING PEELING CONCRETE |
| 141 | SRV | CIRCUM REBAR |
| 2.7 | SRV | CIRCUM REBAR |
| 115.6 | SRC | CIRCUM REBAR |
| 228.6 | SRV | CIRCUM REBAR |
| 145.8 | SRV | CIRCUM REBAR |
| 475.8 | AMH | 4:20AM |
| 130 | SRV | CIRCUM & LONG REBAR |
| 475.4 | SAM | SEVERE AGG |
| 167.9 | SRC | CIRCUM REBAR |
| 17.7 | SRV | CIRCUM REBAR |
| 9.1 | SRV | CIRCUM REBAR |
| 0 | MWM | — |
| 452.9 | SRV | CIRCUM REBAR |
| 36.8 | SRV | CIRCUM REBAR |
| 353.4 | SRV | CIRCUM REBAR |
| 266.9 | SRC | CIRCUM & LONG REBAR |
| 17.7 | SAM | SEVERE AGG |
| 337.4 | SRV | CIRCUM REBAR |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 220.6 | SRV | CIRCUM REBAR |
| 163.7 | SRC | CIRCUM REBAR |
| 6 | SAM | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 156.2 | SRV | CIRCUM REBAR |
| 2.7 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 475.4 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 188.4 | SRC | CIRCUM REBAR |
| 77.7 | SRV | CIRCUM REBAR |