Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 19, 2020, 08:49 AM
  • 16 0053_16 0052_10192020_015931.mp4

Date
10/19/2020
W/O
849888
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00639
PipeID
P13066
Time
1:49 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8127
Sewer Name
ALLEN AVENUE TRUNK, SECTS 1,2,&4
City
SAN GABRIEL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_849888_TV16113_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
16 0053
Downstream MH
16 0052
Dir. of Survey
Downstream
Length Surveyed
372.1 ft.
Total Length
372.1 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
370
O&M Index
2
O&M Quick
312N
O&M Rating
151
Overall Index
2
Overall Quick
Overall Rating
521
Pipe schematic from manhole 16 0053 to 16 0052
MH: 16 0053MH: 16 0052downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 00530 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start130 ft. TBD - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 4", 4" - 70% GREASE-LATERAL/UNKNOWN147.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN323.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"370 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish370 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370 ft. MGO - General Observation - ROACHES @ MH372.1 ft. AMH - Downstream Manhole, Survey Ends - 16 0052372.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    180 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (16)

DistanceCodeObservation
2DAGS
370DAGS
0MWM
370SSS
0AMH16 0053
2.1CM
323.8TFC
147.3TFC
2SSS
130TBD70% GREASE-LATERAL/UNKNOWN
372.1AMH16 0052
372.1CM
0MGOROACHES @ MH
370MGOROACHES @ MH
180TBOPEN
0MWL

Properties (7)

additional_info
6301019200075A1
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-10-19T01:49:50-07:00
documentation
PROPIPE
is_lateral_inspection
false