Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 16, 2020, 06:18 AM
  • A 1167_A 1166_10152020_233530.mp4

Date
10/15/2020
W/O
849615
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00973
PipeID
P02817
Time
11:18 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8126
Sewer Name
JOINT OUTFALL A - UNIT 9
City
SOUTH GATE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_849615_TV02207_SEP2020
Sewer Type
Gravity
Material
RCP-CTL
Shape
Circular
Height
42 in.
Width
15 in.
Upstream MH
A 1167
Downstream MH
A 1166
Dir. of Survey
Downstream
Length Surveyed
405.8 ft.
Total Length
405.8 ft.
Structural Index
4
Structural Quick
5141
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
12
Pipe schematic from manhole A 1167 to A 1166
MH: A 1167MH: A 1166downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 11670 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MB - Missing Brick, from 08 to 04 o'clock, Start - TILES405.8 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish405.8 ft. AMH - Downstream Manhole, Survey Ends - A 1166405.8 ft. MB - Missing Brick, from 08 to 04 o'clock, Finish - TILES405.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Missing Brick, from 08 to 04 o'clock, Start - TILES

    2.1 ft. - Missing Brick, from 08 to 04 o'clock, Start - TILES

Observations (11)

DistanceCodeObservation
2.1SRV
0AMHA 1167
405.8SRV
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
2.1SAP
405.8AMHA 1166
0MWL
405.8MBTILES
2.1MBTILES
405.8SAP

Properties (7)

additional_info
6301015200075P3
custom_field_three
AGGREGATE PROJECTING/MISSING TILES
custom_field_two
2
customer
1
datetime
2020-10-15T23:18:17-07:00
documentation
PROPIPE
is_lateral_inspection
false