Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 15, 2020, 06:16 AM
  • 22 1019_22 1018_10142020_235434.mp4

Date
10/14/2020
W/O
849528
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17388
Time
11:16 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8161
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
13
Purpose
Routine Assessment
Project
WO_849528_TV22055_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 1019
Downstream MH
22 1018
Dir. of Survey
Downstream
Length Surveyed
371.6 ft.
Total Length
371.6 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
355
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
355
Pipe schematic from manhole 22 1019 to 22 1018
MH: 22 1019MH: 22 1018downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10190 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MH11.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"15.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"151.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"307.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"357 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"371.2 ft. MGO - General Observation - COCKROACHES IN MH371.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371.6 ft. AMH - Downstream Manhole, Survey Ends - 22 1018

Observation photos (4)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    371.2 ft. - General Observation - COCKROACHES IN MH

Observations (18)

DistanceCodeObservation
52.3TFC
307.7TFC
11.5TBA
371.2MGOCOCKROACHES IN MH
0MWL
0AMH22 1019
258.6TFC
15.6SAV
357TFC
0MWM
371.2SSS
371.6AMH22 1018
15.6SSS
151.3TFC
371.2SAV
101.8TFC
208.9TFC
0MGOCOCKROACHES IN MH

Properties (7)

additional_info
6301014200138P1
custom_field_three
VISIBLE AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2020-10-14T23:16:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false