Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2020, 10:28 AM
  • 22 0605_22 0604_10262020_024038.mp4

Date
10/26/2020
W/O
849674
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00796
PipeID
P16952
Time
3:28 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8172
Sewer Name
CIENEGA AVENUE TRUNK
City
CHARTER OAK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_849674_TV22022_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
22 0605
Downstream MH
22 0604
Dir. of Survey
Downstream
Length Surveyed
171.9 ft.
Total Length
171.9 ft.
Structural Index
2
Structural Quick
3E2F
Structural Rating
162
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
2
Overall Quick
Overall Rating
228
Pipe schematic from manhole 22 0605 to 22 0604
MH: 22 0605MH: 22 0604downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06050 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start11.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"61.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"103 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"110.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"164.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish169.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish169.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish171.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0604171.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWM
0MGOROACHES @ MH
171.9AMH22 0604
169.4DAGS
2SSS
61.7TFC
0MWL
164.5TFC
0AMH22 0605
169SSS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
11.2TFC
103TFC
171.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
169.4CM
2CM
2DAGS
110.4TFC

Properties (7)

additional_info
6301026200138A2
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2020-10-26T03:28:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false