Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2020, 12:11 PM
  • 16 0563_16 0562_1162020_041543.mp4

Date
11/06/2020
W/O
0854901
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00659
PipeID
P13614
Time
4:11 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1617
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
20201105MDM_LAMANDA_PARK_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Upstream MH
16 0563
Downstream MH
16 0562
Dir. of Survey
Downstream
Length Surveyed
234.8 ft.
Total Length
234.8 ft.
Structural Index
3
Structural Quick
4233
Structural Rating
21
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
21
Pipe schematic from manhole 16 0563 to 16 0562
MH: 16 0563MH: 16 0562downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM2 ft. MGO - General Observation - MAG COAT 99% START2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - DEEP BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE UNDER MAG COAT7.6 ft. SAP - Surface Aggregate Projecting, from 07 to 08 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG7.6 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT7.6 ft. SAP - Surface Aggregate Projecting, from 04 to 05 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG40.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active67.6 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG84.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open108.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active139.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active181 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open210 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open222.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active229.8 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG234.4 ft. MGO - General Observation - MAG COAT 99% FINISH234.4 ft. SAP - Surface Aggregate Projecting, from 04 to 05 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG234.4 ft. SAP - Surface Aggregate Projecting, from 07 to 08 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG234.4 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG234.4 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - DEEP BLISTERING PEELING CONCRETE234.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING CONCRETE234.8 ft. AMH - Downstream Manhole, Survey Ends - 4:35AM

Observation photos (8)

  • General Observation - MAG COAT 99% START

    2 ft. - General Observation - MAG COAT 99% START

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - DEEP BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - DEEP BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE UNDER MAG COAT

  • Surface Aggregate Projecting, from 07 to 08 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    7.6 ft. - Surface Aggregate Projecting, from 07 to 08 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    7.6 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Projecting, from 04 to 05 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    7.6 ft. - Surface Aggregate Projecting, from 04 to 05 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    67.6 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    229.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (25)

DistanceCodeObservation
222.1TFActive
7.6SAPSEVERE AGG
84.9TFOpen
234.4MGOMAG COAT 99% FINISH
210TFOpen
234.4SAPSEVERE AGG
2MGOMAG COAT 99% START
234.8AMH4:35AM
234.4SAPSEVERE AGG
0MWM
0MWL
181TFOpen
67.6SAMSEVERE AGG
2SSSDEEP BLISTERING PEELING CONCRETE UNDER MAG COAT
7.6SAPSEVERE AGG UNDER MAG COAT
139.5TFAActive
234.4SAPSEVERE AGG
108.3TFAActive
0AMH4:15AM
7.6SAPSEVERE AGG
229.8SAMSEVERE AGG
234.4SSSDEEP BLISTERING PEELING CONCRETE
40.2TFAActive
2SSSBLISTERING FLAKING CONCRETE UNDER MAG COAT
234.4SSSBLISTERING FLAKING CONCRETE

Properties (6)

custom_field_three
SEVERE AGG MISSING-99% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2020-11-06T04:11:17-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false