Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2020, 09:41 AM
  • 16 0569_16 0568_1162020_014615.mp4

Date
11/06/2020
W/O
0854901
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00659
PipeID
P13620
Time
1:41 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1617
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
20201105MDM_LAMANDA_PARK_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Upstream MH
16 0569
Downstream MH
16 0568
Dir. of Survey
Downstream
Length Surveyed
178.8 ft.
Total Length
178.8 ft.
Structural Index
3
Structural Quick
5142
Structural Rating
22
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
26
Pipe schematic from manhole 16 0569 to 16 0568
MH: 16 0569MH: 16 0568downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:45AM0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 99% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE UNDER MAG COAT7.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped18.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT24.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped48.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped58.3 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT67.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Capped74.8 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG74.8 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR84.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped94.2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG UNDER MAG COAT108.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped128.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped131.2 ft. RMB - Roots Medium Barrell, from 01 to 03 o'clock, 5 %, within 8 inches of joint: YES140.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open169.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Capped173.4 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG178.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING CONCRETE178.4 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish - SEVERE AGG178.4 ft. MGO - General Observation - Conn. @ Mh, 9:30 Cl OPEN178.4 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE178.4 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEM178.8 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (8)

  • General Observation - MAG COAT 99% START

    2 ft. - General Observation - MAG COAT 99% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    18.2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT

    58.3 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    74.8 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR

    74.8 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG UNDER MAG COAT

    94.2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    173.4 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (27)

DistanceCodeObservation
74.8SAPSEVERE AGG
178.4SSSBLISTERING FLAKING CONCRETE
108.9TFCCapped
140.9TFOpen
48.4TFCCapped
18.2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
2MGOMAG COAT 99% START
84.5TFCCapped
24.2TFCCapped
128.7TFCCapped
169.3TFCCapped
178.4SAMSEVERE AGG
178.4MGOConn. @ Mh, 9:30 Cl OPEN
7.9TFCCapped
0AMH1:45AM
131.2RMB
58.3SSSPEELING CONCRETE UNDER MAG COAT
0MWL
178.8AMH2:15AM
67.9TFCCapped
173.4SAMSEVERE AGG
0MWM
94.2SAMSEVERE AGG UNDER MAG COAT
178.4SSSBLISTERING PEELING CONCRETE
74.8SRVLONG REBAR
2SSSBLISTERING CONCRETE UNDER MAG COAT
178.4MGOConn. @ Mh, 9 O' Clock. OPEM

Properties (6)

custom_field_three
LONG REBAR VISIBLE- MISSING SEVERE AGG
custom_field_two
2
customer
LACSD
datetime
2020-11-06T01:41:37-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false