Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 16, 2020, 07:13 AM
  • 22 0534A_22 0534_10162020_002924.mp4

Date
10/16/2020
W/O
849889
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00791
PipeID
P16876
Time
12:13 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8162
Sewer Name
BEN LOMOND TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_849889_TV22102_SEP2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0534A
Downstream MH
22 0534
Dir. of Survey
Downstream
Length Surveyed
258.8 ft.
Total Length
258.8 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
153
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
3
Overall Quick
Overall Rating
255
Pipe schematic from manhole 22 0534A to 22 0534
MH: 22 0534AMH: 22 0534downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 0534A0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"41.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"86.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"193.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"243.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish258.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0534258.8 ft. MGO - General Observation - ROACHES @ MH

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
140.2TFC
258.8AMH22 0534
41.5TFC
2DAGS
258.1DAGS
193.6TFC
2SAP
0MGOROACHES @ MH
0MWL
0AMH22 0534A
86.8TFC
82.9TFC
243.4TFC
0MWM
36.8TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
258.8MGOROACHES @ MH
144.6TFC
198.3TFC
258.1SAP

Properties (7)

additional_info
6301015200138P1
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-10-16T00:13:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false