Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2020, 06:26 AM
  • B 0762_B 0761B_10232020_001012.mp4

Date
10/22/2020
W/O
849730
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00112
PipeID
P26532
Time
11:26 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8169
Sewer Name
JOINT OUTFALL B - UNIT 8J
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_849730_TV15210_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 0762
Downstream MH
B 0761B
Dir. of Survey
Downstream
Length Surveyed
125.3 ft.
Total Length
125.3 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
120
O&M Index
2
O&M Quick
2D00
O&M Rating
48
Overall Index
2
Overall Quick
Overall Rating
168
Pipe schematic from manhole B 0762 to B 0761B
MH: B 0762MH: B 0761Bdownstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07620 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start121.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish121.3 ft. MGO - General Observation - COCKROACHES IN MH121.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish121.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish125 ft. MGO - General Observation - CONNECTION @ D/S MH - 11 O'CLOCK125.3 ft. AMH - Downstream Manhole, Survey Ends - B 0761B

Observation photos (5)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    121.3 ft. - General Observation - COCKROACHES IN MH

Observations (13)

DistanceCodeObservation
0MWL
0AMHB 0762
125.3AMHB 0761B
125MGOCONNECTION @ D/S MH - 11 O'CLOCK
0MGOCOCKROACHES IN MH
121.3SSS
121.3MGOCOCKROACHES IN MH
121.3SAP
121.3DAGS
2DAGS
0MWM
2SAP
2SSS

Properties (8)

additional_info
6301022200075P3
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2020-10-22T23:26:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
42005