Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 2, 2020, 04:13 AM
  • C 0321_C 0320_10012020_212409.mp4

Date
10/01/2020
W/O
850057
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00136
PipeID
P09784
Time
9:13 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8106
Sewer Name
JOINT OUTFALL C - UNIT 6G
City
ARTESIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
40
Purpose
Routine Assessment
Project
RFIR_WO_850057_TV02311_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
C 0321
Downstream MH
C 0320
Dir. of Survey
Downstream
Length Surveyed
262.4 ft.
Total Length
262.4 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
364
Pipe schematic from manhole C 0321 to C 0320
MH: C 0321MH: C 0320downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03210 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - 70% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start260 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish262 ft. MGO - General Observation - ROACHES @ MH262.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish262.4 ft. AMH - Downstream Manhole, Survey Ends - C 0320262.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MGOROACHES @ MH
2.5SSS
2MGO70% MAG COAT
262.4SAV
260DAGS
262MGOROACHES @ MH
2DAGS
0MWM
2.5SAV
262.4AMHC 0320
0AMHC 0321
262.4SSS
0MWL

Properties (7)

additional_info
6301001200098P1
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2020-10-01T21:13:32-07:00
documentation
PROPIPE
is_lateral_inspection
false