Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 22, 2020, 04:14 PM
  • 2_1_1_22102020_094510.mp4

Date
10/22/2020
W/O
0853364
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00139
PipeID
P09815
Time
9:14 AM
Certificate
U-415-06024039
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0352
Sewer Name
JOINT OUTFALL C - UNIT 8A
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
20201020DF_JOINT_OUTFALL_C_UNIT_8A
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
C 0351
Downstream MH
C 0352
Dir. of Survey
Upstream
Length Surveyed
804.2 ft.
Total Length
804.2 ft.
Structural Index
4
Structural Quick
53_
Structural Rating
2400
O&M Index
2
O&M Quick
423I
O&M Rating
795
Overall Index
3
Overall Quick
Overall Rating
3195
Pipe schematic from manhole C 0351 to C 0352
MH: C 0351MH: C 0352upstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 11:31 AM0 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. ID - Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish0 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish102.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"184.2 ft. IR - Infiltration Runner, from 03 to 04 o'clock, within 8 inches of joint: YES246.2 ft. IR - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES253.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"385.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"696.2 ft. ID - Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: YES, Start802.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start802.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start802.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start802.2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start802.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start802.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start804.2 ft. AMH - Downstream Manhole, Survey Begins - 9:17 AM804.2 ft. MWM - Water Mark, 25 %of cross sectional area804.2 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (5)

  • Downstream Manhole, Survey Begins - 9:17 AM

    0 ft. - Downstream Manhole, Survey Begins - 9:17 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    108 ft. - Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    419 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"

Observations (23)

DistanceCodeObservation
419TFA
804.2SAP
2DAE
804.2AMH11:31 AM
804.2SRV
702TFA
804.2SSS
620IR
0AMH9:17 AM
2DAGS
804.2SRC
558IR
2SSS
804.2ID
108ID
2SRC
804.2DAE
0MWM
551TFA
2SRV
804.2DAGS
0MWL
2SAP

Properties (6)

custom_field_three
INFILTRATION RUNNERS/REINFORCEMENT CORRODED
custom_field_two
2
customer
1
datetime
2020-10-22T09:14:49-07:00
documentation
FRANKLIN, SHADLER, IGNACIO, RAMIREZ, BRAR
is_lateral_inspection
false