Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 24, 2020, 07:08 PM
  • 1_1_1_24102020_123317.mp4

Date
10/24/2020
W/O
0850190
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00182
PipeID
P10919
Time
12:08 PM
Certificate
U-415-06024039
System Owner
1
Date Cleaned
Pre-Cleaning
Media Label
I0355
Sewer Name
JOINT OUTFALL H - UNIT 7A
City
LA PUENTE
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
30
Purpose
Routine Assessment
Project
20201024DF_JOINT_OUTFALL_H_UNIT_7A
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
H 0493
Downstream MH
H 0492
Dir. of Survey
Downstream
Length Surveyed
461 ft.
Total Length
461 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
460
O&M Index
2
O&M Quick
2Q00
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
644
Pipe schematic from manhole H 0493 to H 0492
MH: H 0493MH: H 0492downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:12 PM1 ft. MWL - Water Level, 20 %of cross sectional area1 ft. MWM - Water Mark, 25 %of cross sectional area1.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start1.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.9 ft. MGO - General Observation - 65% MAG COAT1.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start237 ft. MGP - General Photograph460.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish460.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish460.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish461 ft. MGO - General Observation - ROACHES @ MH461 ft. AMH - Downstream Manhole, Survey Ends - 1:15 PM

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    237 ft. - General Photograph

Observations (13)

DistanceCodeObservation
1.9DAGS
237MGP
460.3SSS
461MGOROACHES @ MH
0AMH12:12 PM
461AMH1:15 PM
1.9SSS
1MWL
1.9MGO65% MAG COAT
460.3DAGS
460.3SAV
1.9SAV
1MWM

Properties (6)

custom_field_three
SPALLING/AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2020-10-24T12:08:11-07:00
documentation
FRANKLIN, BRAR, RAMIREZ
is_lateral_inspection
false