Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 24, 2020, 01:53 PM
  • 1_1_1_24102020_070015.mp4

Date
10/24/2020
W/O
0855100
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00035
PipeID
P10173
Time
6:53 AM
Certificate
U-415-06024039
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0354
Sewer Name
JOINT OUTFALL F - UNIT 3A
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Capital Improvement Program Assesment
Project
20201024DF_JOINT_OUTFALL_F_UNIT_3A
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
30 in.
Upstream MH
F 0077
Downstream MH
F 0076
Dir. of Survey
Downstream
Length Surveyed
4 ft.
Total Length
4 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole F 0077 to F 0076
MH: F 0077MH: F 0076downstream0 ft. AMH - Upstream Manhole, Survey Begins - 6:57 AM0.1 ft. MWL - Water Level, 20 %of cross sectional area0.1 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. MGP - General Photograph2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES2.1 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES4 ft. AMH - Downstream Manhole, Survey Ends - 7:08 AM (ZOOMED)

Observation photos (3)

  • General Photograph

    2.1 ft. - General Photograph

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (8)

DistanceCodeObservation
4AMH7:08 AM (ZOOMED)
0AMH6:57 AM
2.1MGP
0.1MWL
2.1SAP
2.1SRC
2.1SSS
0.1MWM

Properties (4)

customer
1
datetime
2020-10-24T06:53:19-07:00
documentation
FRANKLIN, MIRANDA, RAMIREZ, BRAR
is_lateral_inspection
false