Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2020, 07:58 AM
  • H 1400_H 1399_08212020_005942.mp4

Date
08/21/2020
W/O
844678
Weather
Dry
Operator/Surveyor
JOSE GONZALEZ
Sewer ID
Z01204
PipeID
P25684
Time
12:58 AM
Certificate
U-0720-70309215
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7963
Sewer Name
JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_844678_TV22034_AUG2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1400
Downstream MH
H 1399
Dir. of Survey
Downstream
Length Surveyed
208.5 ft.
Total Length
208.5 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
287
Pipe schematic from manhole H 1400 to H 1399
MH: H 1400MH: H 1399downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 14000 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start45.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"167 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.5 ft. AMH - Downstream Manhole, Survey Ends - H 1399208.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish208.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish208.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE208.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
45.7TFC
2MGOMAG COATING THROUGHOUT
2SSS
142.4TFC
208.5AMHH 1399
118.3TFC
0MGOCOCKROACHES IN MANHOLE
0MWL
0AMHH 1400
96.1TFC
208.5SSS
0MWM
208.5DAGS
70TFC
167TFC
199.7TFC
208.5MGOCOCKROACHES IN MANHOLE
208.5MGOCONNECTION AT MH 3 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
2DAGS

Properties (7)

additional_info
SC411853
custom_field_three
SPALLING
custom_field_two
4
customer
1
datetime
2020-08-21T00:58:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false