Wastewater/Activity/PacpInspection/1.0Aug 20, 2020, 06:11 AM
  • H 1406_H 1405_08192020_234805.mp4

Date
08/19/2020
W/O
844678
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01204
PipeID
P16277
Time
11:11 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7961
Sewer Name
JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
WO_844678_TV22034_AUG2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1406
Downstream MH
H 1405
Dir. of Survey
Downstream
Length Surveyed
411.1 ft.
Total Length
411.1 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
410
O&M Index
2
O&M Quick
2O00
O&M Rating
164
Overall Index
2
Overall Quick
Overall Rating
574
Pipe schematic from manhole H 1406 to H 1405
MH: H 1406MH: H 1405downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - H 14060 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"45.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"94.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"117.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"269.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"295.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"342.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"349.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"411.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE411.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish411.1 ft. AMH - Downstream Manhole, Survey Ends - H 1405411.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    411.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (23)

DistanceCodeObservation
19.7TFC
0MWL
0MGOCOCKROACHES IN MANHOLE
117.3TFC
295.3TFC
0AMHH 1406
2DAGS
196.7TFC
2MGOMAG COATING THROUGHOUT
94.8TFC
411.1MGOCOCKROACHES IN MANHOLE
141.8TFC
411.1DAGS
0MWM
342.1TFC
349.9TFC
269.3TFC
45.9TFC
411.1AMHH 1405
2SSS
411.1SSS
164.2TFC
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC411851
custom_field_two
4
customer
1
datetime
2020-08-19T23:11:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false