Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2020, 09:10 AM
  • H 1393_H 1392_09102020_023542.mp4

Date
09/10/2020
W/O
844678
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01204
PipeID
P16267
Time
2:10 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7985
Sewer Name
JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_844678_TV22034_AUG2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
H 1393
Downstream MH
H 1392
Dir. of Survey
Downstream
Length Surveyed
461.2 ft.
Total Length
461.2 ft.
Structural Index
2
Structural Quick
3O2P
Structural Rating
403
O&M Index
2
O&M Quick
2Q00
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
587
Pipe schematic from manhole H 1393 to H 1392
MH: H 1393MH: H 1392downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 13930 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"26.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"45.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start52.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"123 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"194.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"217.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"266.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"288.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"409.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"459.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish461.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish461.2 ft. AMH - Downstream Manhole, Survey Ends - H 1392

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    45.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
123TFC
459.3SSS
26.9TB
3TFC
409.3TFC
241.3TFC
52.2TFC
0AMHH 1393
2DAGS
0MWL
461.1DAGS
0MWM
144.8TFC
194.5TFC
217.6TFC
45.5SSS
461.2AMHH 1392
266.6TB
288.8TFC

Properties (7)

additional_info
SC411877
custom_field_three
SPALLING
custom_field_two
4
customer
1
datetime
2020-09-10T02:10:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false