Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2019, 09:35 AM
  • 14 0163A_14 0163_09122019_024850.mp4

Date
09/12/2019
W/O
787624
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18202
Time
2:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6895
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_787624_TV14035_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0163A
Downstream MH
14 0163
Dir. of Survey
Downstream
Length Surveyed
329.1 ft.
Total Length
329.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
459
Pipe schematic from manhole 14 0163A to 14 0163
MH: 14 0163AMH: 14 0163downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0163A0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"7.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"55.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"105.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"207.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"257.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"301.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"304.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"321.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS327.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish327.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish327.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0163329.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (28)

DistanceCodeObservation
156.7TFC
55.6TFC
5.3TFC
0AMH14 0163A
329.1AMH14 0163
304.9TFC
327.2SSS
58.7TFC
327.2DAGS
329.1MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SSS
301.9TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
7.9TFC
105.9TFC
204.6TFC
207.4TFC
0MWM
153.7TFC
0MWL
2DAGS
321.4DSZDEBRIS
257.7TFC
327.2DSZ
254.5TFC
109TFC
327.2SAP
2SAP

Properties (6)

additional_info
SC378611
custom_field_two
2
customer
LACSD
datetime
2019-09-12T02:35:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false