Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2019, 09:07 AM
  • H 1409_H 1408 _08152019_022350.mp4

Date
08/15/2019
W/O
782286
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01204
PipeID
P16280
Time
2:07 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6805
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_782286_TV22174_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1409
Downstream MH
H 1408
Dir. of Survey
Downstream
Length Surveyed
262.9 ft.
Total Length
262.9 ft.
Structural Index
3
Structural Quick
3T2I
Structural Rating
416
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
417
Pipe schematic from manhole H 1409 to H 1408
MH: H 1409MH: H 1408downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 14090.1 ft. MWM - Water Mark, 40 %of cross sectional area0.1 ft. MWL - Water Level, 15 %of cross sectional area0.1 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - @ MH2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"85.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"215.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 8"240.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 8"259.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish259.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish261 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish262.9 ft. AMH - Downstream Manhole, Survey Ends - H 1408262.9 ft. MGO - General Observation - CONN 9 O'CLOCK/ACTIVE

Observation photos (3)

  • General Observation - 70% MAG COAT THROUGHOUT

    2 ft. - General Observation - 70% MAG COAT THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0.1MWM
261SAV
0.1MWL
2SAV
240.3TBA
215.8TFC
0.1MGOCONN 9 O'CLOCK @ MH/ACTIVE
2MGO70% MAG COAT THROUGHOUT
262.9AMHH 1408
259.9SSS
259.9SAP
37.1TFC
0AMHH 1409
85.7TFC
2SAP
2VC@ MH
2.1SSS
262.9MGOCONN 9 O'CLOCK/ACTIVE

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-15T02:07:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false