Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2019, 08:08 AM
  • H 1482_H 1387 _08152019_012323.mp4

Date
08/15/2019
W/O
782286
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01204
PipeID
P16261
Time
1:08 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6805
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_782286_TV22174_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 1482
Downstream MH
H 1387
Dir. of Survey
Downstream
Length Surveyed
133.4 ft.
Total Length
133.6 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
130
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
130
Pipe schematic from manhole H 1482 to H 1387
MH: H 1482MH: H 1387downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 14820 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH2 ft. MGO - General Observation - 80% MAG COAT THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 10" - OPEN46.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 8"70.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"94.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 8"131.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish131.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish133.4 ft. AMH - Downstream Manhole, Survey Ends - H 1387

Observation photos (3)

  • General Observation - CONN 9 O'CLOCK @ MH

    0 ft. - General Observation - CONN 9 O'CLOCK @ MH

  • General Observation - 80% MAG COAT THROUGHOUT

    2 ft. - General Observation - 80% MAG COAT THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2.1SAP
70.3TFC
0MWL
0MWM
94.3TFC
118.8TF
46.5TFC
2MGO80% MAG COAT THROUGHOUT
133.4AMHH 1387
22.1TFOPEN
131.5SAP
131.6SSS
0AMHH 1482
0MGOCONN 9 O'CLOCK @ MH
2SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-15T01:08:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false