Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 30, 2020, 06:26 AM
  • 21 0645_21 0644_09292020_233602.mp4

Date
09/29/2020
W/O
850192
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00787
PipeID
P15797
Time
11:26 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8102
Sewer Name
TRI-CITIES OUTFALL RELIEF TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
15
Purpose
Routine Assessment
Project
WO_850192_TV21040_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
21 0645
Downstream MH
21 0644
Dir. of Survey
Downstream
Length Surveyed
322 ft.
Total Length
322 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 21 0645 to 21 0644
MH: 21 0645MH: 21 0644downstream0 ft. AMH - Upstream Manhole, Survey Begins - 21 06450 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 10 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start322 ft. AMH - Downstream Manhole, Survey Ends - 21 0644322 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0AMH21 0645
0MWL
0MGOCONNECTION AT MH 9 O'CLOCK
322AMH21 0644
322SAV
2.1SAV
322MGOCONNECTION AT MH 9 O'CLOCK
0MWM

Properties (7)

additional_info
SC411965
custom_field_three
aggregate visible
custom_field_two
3
customer
1
datetime
2020-09-29T23:26:39-07:00
documentation
PROPIPE
is_lateral_inspection
false