Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2020, 04:33 PM
  • 21 0223_H 1083 _09292020_094116.mp4

Date
09/29/2020
W/O
849680
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00763
PipeID
P22614
Time
9:33 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8057
Sewer Name
DISTRICT #21 OUTFALL TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
WO_849680_TV21009_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
21 0223
Downstream MH
H 1083
Dir. of Survey
Downstream
Length Surveyed
103 ft.
Total Length
103 ft.
Structural Index
2
Structural Quick
2C00
Structural Rating
40
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
40
Pipe schematic from manhole 21 0223 to H 1083
MH: 21 0223MH: H 1083downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 02232 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT start53.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"102 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish103 ft. AMH - Downstream Manhole, Survey Ends - H 1083103 ft. MGO - General Observation - MAG COAT END

Observation photos (1)

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    53.4 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (9)

DistanceCodeObservation
2SSS
102SSS
53.4TBA
0MWM
103AMHH 1083
2MGOMAG COAT start
103MGOMAG COAT END
0MWL
0AMH21 0223

Properties (7)

additional_info
412006
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-29T09:33:29-07:00
documentation
PRO PIPE
is_lateral_inspection
false